View as Grid List

Items 1-20 of 22

Set Descending Direction
  1. 32A Rubber Boxed Distribution with 4 Sockets rated 16A
    32A Portable Rubber Power Distro Board With RCBOs - 32.1.H8.2
    SKU:ENCS32/16/RCBO/4
    • 4 Outlets: 16/1
    • RCBOs
    • Designed & Made in UK
    • Titan Plus 2 Year Warranty
    Lead time:
    1 Week
    £603.37 £502.81
  2. 16A H/D Rubber Socket Board with 4 x 16A sockets + 4 x 16A MCB + RCD
    16A Portable Power Distribution Board With RCD + MCBs 230v - 16.1.H6.2
    SKU:ENCS16/16/4
    • Outlets: 16/1
    • RCD + MCBs
    • Designed & Made in UK
    • Titan Plus 2 Year Warranty
    Lead time:
    Next Day
    £304.13 £253.44
  3. 16A H/D Rubber Socket Board with 5 x 13A sockets front
    16A Portable Power Distribution Socket Board 230v - 16.1.H2.1
    SKU:ENCS16/13
    • Outlets: 13/1
    • No Protection
    • Designed & Made in UK
    • Titan Power 1 Year Warranty
    Lead time:
    1 Week
    £224.62 £187.18
  4. 16A H/D Rubber Socket Board with 5 x 16A sockets
    16A Portable Power Distribution Socket Board 230v - 16.1.H2.1
    SKU:ENCS16/16
    • Outlets: 16/1
    • No Protection
    • Designed & Made in UK
    • Titan Power 1 Year Warranty
    Lead time:
    1 Week
    £276.00 £230.00
  5. 16A Rubber Socket Board with 6 x 13A Sockets
    16A Portable Power Distribution Board - Single Phase 230v - 16.1.H6.1
    SKU:ENCS16/13/16
    • Outlets: 13/1
    • No Protection
    • Designed & Made in UK
    • Titan Power 1 Year Warranty
    Lead time:
    1 Week
    £251.84 £209.87
  6. 3.3.H6.T - TITAN POWER 32A 400V DISTRIBUTION TO 3 X 16/1. RCBOS
    32A Portable Power Distribution Board with RCBOs - 32.3.H6.3
    SKU:ENCS32/415/3/16
    • 3 Outlets: 16/1
    • RCBOs
    • Designed & Made in UK
    • Titan Pro 3 Year Warranty
    Lead time:
    1 Week
    £550.49 £458.74
  7. 32 Amp Phase Splitter Rubber Box, to 3 Single Phase Sockets with RCD protection
    32A Portable Power Distribution Socket Board With RCBOs - 32.3.H13.3
    SKU:ENCS32/32/3/32/415/R
    • 4 Outlets: 32/3, 32/1
    • RCBOs
    • Designed & Made in UK
    • Titan Pro 3 Year Warranty
    Lead time:
    1 Week
    £623.02 £519.18
  8. 3 Phase splitter 32amp to single phase 32a sockets with RCBO protection
    32A Portable Power Distribution Socket Board With RCBOs - 32.3.H8.2
    SKU:ENCS32/415/32
    • 3 Outlets: 32/1
    • RCBOs
    • Designed & Made in UK
    • Titan Plus 2 Year Warranty
    Lead time:
    1 Week
    £564.19 £470.16
  9. Portable Power Distribution 32 Amp with mennekes 16A sockets
    32A Portable Power Distribution Board With RCBO + MCBs - 32.1.H8.2
    SKU:ENCS32/16/4/13/2
    • 6 Outlets: 16/1, 13/1
    • RCBO + MCBs
    • Designed & Made in UK
    • Titan Plus 2 Year Warranty
    Lead time:
    1 Week
    £502.57 £418.81
  10. 32A Rubber Socket Board with 4 x 16A sockets + 4 x 16A MCB + RCD
    32A Portable Rubber Power Distro With RCD + MCBs - 32.1.H6.2
    SKU:ENCS32/16/4
    • 4 Outlets: 16/1
    • RCD + MCBs
    • Designed & Made in UK
    • Titan Plus 2 Year Warranty
    Lead time:
    1 Week
    £471.61 £393.01
  11. 32A Rubber Socket Board with 5 x 13A sockets
    32A Portable Power Distribution Socket Board - Single Phase - 32.1.H2.1
    SKU:ENCS32/13
    • 5 Outlets: 13/1
    • No Protection
    • Designed & Made in UK
    • Titan Power 1 Year Warranty
    Lead time:
    1 Week
    £221.50 £184.58
  12. 32A Rubber Socket Board with 6 x 13A sockets + 32A 30mA RCBO
    32A Portable Rubber Power Distro Board with RCBO - 32.1.H6.2
    SKU:ENCS32/13/RCBO
    • 6 Outlets: 13 Amp
    • 1 x RCBO
    • Designed & Made in UK
    • Titan Plus 2 Year Warranty
    Lead time:
    1 Week
    £424.42 £353.68
  13. 63A Portable Power Distribution Socket Board - Three Phase - 63.3.H8.2
    63A Portable Power Distribution Socket Board - Three Phase - 63.3.H8.2
    SKU:ENCS63/32/RCBO
    • 3 Outlets: 32/1
    • RCBOs
    • Designed & Made in UK
    • Titan Plus 2 Year Warranty
    Lead time:
    1 Week
    £694.49 £578.74
  14. 63A Rubber Socket Board with 2 x 32A sockets 2 X 32A MCBs Only
    63A Portable Power Distribution Socket Board - Single Phase - 63.1.H8.1
    SKU:ENCS63/32B
    • 2 Outlets: 32/1
    • MCBs
    • Designed & Made in UK
    • Titan Power 1 Year Warranty
    Lead time:
    1 Week
    £433.22 £361.02
  15. 63A Rubber Socket Board with 2 x 32A/415V sockets + 2 x 32A 3P MCBs
    63A Portable Power Distribution Socket Board - Three Phase - 63.3.H8.1
    SKU:ENCS63/415
    • 2 Outlets: 32/3
    • MCBs
    • Designed & Made in UK
    • Titan Power 1 Year Warranty
    Lead time:
    1 Week
    £597.28 £497.73
  16. 63A Rubber Socket Board with 2x32A sockets + MCBs & RCD
    63A Portable Power Distribution Socket Board - Single Phase - 63.1.H8.2
    SKU:ENCS63/32
    • 2 Outlets: 32/1
    • RCD + MCBs
    • Designed & Made in UK
    • Titan Plus 2 Year Warranty
    Lead time:
    1 Week
    £491.96 £409.97
  17. 63A Portable Power Board with 2 x 32A 400V sockets
    63A Portable Power Distribution Socket Board - Three Phase - 63.3.H8.3
    SKU:ENCS63/415/32/RCBO
    • 2 Outlets: 32/3
    • RCBOs
    • Designed & Made in UK
    • Titan Pro 3 Year Warranty
    Lead time:
    1 Week
    £729.37 £607.81
  18. TITAN 63A 415v to 3 x 32A 230v, 6 x 16A 230v Sockets with RCD & MCB protection
    63A Portable Power Distribution Socket Board - Three Phase - 63.3.H13.2
    SKU:ENCS63/415/S13/32/16
    • 9 Outlets: 32/1, 16/1
    • RCD + MCBs
    • Designed & Made in UK
    • Titan Plus 2 Year Warranty
    Lead time:
    1 Week
    £782.58 £652.15
  19. 16 amp rubber box distribution to 3 x 16A and 3 x 13A sockets
    16A Portable Power Distribution Socket Board With RCBOs - 16.3.H8.1
    SKU:ENCS16/415/16/13
    • Outlets: 16/1, 13/1
    • RCBOs
    • Designed & Made in UK
    • Titan Power 1 Year Warranty
    Lead time:
    1 Week
    £556.97 £464.14
  20. 32A Rubber Socket Board 32A/415V in 2 x 16A/415V out with MCB's
    32A Portable Power Distribution Socket Board - Three Phase - 32.3.H8.1
    SKU:ENCS32/415/16/2/R
    • 2 Outlets: 16/3
    • RCBOs
    • Designed & Made in UK
    • Titan Power 1 Year Warranty
    Lead time:
    1 Week
    £597.32 £497.77
Page
per page