Due to increased demand, our manufacturing lead times are currently extended. If your order is urgent, please check availability before placing an order. This applies to extension lead and distribution boards. 

 

480A Inlets and Outlets for High Power Applications

View as Grid List

2 Items

Set Descending Direction
  1. Powerlock 480A Syntax Chain Pilot Box (Drain)
    Powerlock 5 Way Rack Panel 480A (Drain) Inlets Chain Pilot by Syntax
    SKU:EA500/CP/D/BOX
    • Interlock Safe Switching
    • 19 Inch Rack Mount
    Lead time:
    Next Day
    £1,169.94 £974.95
  2. Powerlock 480A Syntax Chain Pilot Box (Source)
    Powerlock 5 Way Rack Panel 480A (Source) Outlets Chain Pilot by Syntax
    SKU:EA500/CP/S/BOX
    • Interlock Safe Switching
    • 19 Inch Rack Mount
    Lead time:
    2 - 3 weeks
    £1,169.94 £974.95
per page